PROJECT DESIGN

PROJECT DESIGN

We provide design services for complete substations (electrical and civil) for all voltage levels up to 400kV:

  • •Feasibility studies
  • •Insulation coordination studies
  • •Conceptual designs
  • •Preliminary designs
  • •Building permit designs
  • •As-built designs
2017
  • • Circuit diagrams, electrical installation Main Project and as-built for SS 110/10kV Belgrade 23
  • • Conceptual, Main and Construction projects for telecommunications for SS Mozura 110/30kV
  • • Technical documentation for legalization of non-energy facilities in AD "EMS"
2016
  • • Complete technical documentation for SS 110/35/10kV "Kopaonik"
  • • Primary design - HF reactor removal and 400kV primary link replacement: Lovedean-Mannington-Nursling, UK
  • • Secondary design – replacement of control and protection system at SS Currie 275/132 kV, UK
2015
  • • Secondary design – wiring diagrams for Drakellow bay, SS Oldbury, UK
  • • Design documentation for primary equipment replacement at SS Belgrade 1, 110/35/10 kV
  • • Feasibility studies, environmental studies, insulation coordination studies for SS 110/35/10kV Kopaonik